Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

Office of the Revisor of Statutes

116.801 INCINERATING INFECTIOUS WASTE; PERMIT REQUIRED.

(a) Except as provided in paragraph (b), a person may not construct, or expand the capacity of, a facility for the incineration of infectious waste, as defined in section 116.76, without having obtained an air emission permit from the agency.

(b) This section does not affect permit requirements under the rules of the agency for an incinerator that is upgraded to meet pollution control standards or an incinerator with a capacity of 350 pounds or less per hour that is planned to manage waste generated primarily by the owner or operator of the incinerator.

History:

1991 c 231 s 1

Official Publication of the State of Minnesota
Revisor of Statutes