The commission shall impose in any site permit for a large electric power generating plant or route permit for a high voltage transmission line such conditions as the commission deems appropriate and are supported by the record.
When the commission issues a permit for a route for a high voltage transmission line, the commission shall specify the design, route, right-of-way preparation, and facility construction and operation it deems necessary. The commission may impose a condition in the permit requiring the permittee to construct a high voltage transmission line that is capable of expansion in transmission capacity through multiple circuiting or design modifications.
27 SR 1295; L 2005 c 97 art 3 s 19
This part is repealed effective July 1, 2025. L 2024 c 126 art 7 s 15; L 2024 c 127 art 43 s 15.