103E.111 FIELD SURVEYS AND INVESTIGATIONS BY DIRECTOR.
Subdivision 1.
Authorization. If a field survey or investigation of a drainage project or
drainage system is determined to be necessary by the director or is requested in writing by the
drainage authority, the director may conduct the survey or investigation.
Subd. 2.
Costs if requested by drainage authority. If the field survey or investigation is
made at the request of a drainage authority, the cost must be reported to the drainage authority and
paid by the drainage authority as a drainage project or drainage system expense.
History: 1990 c 391 art 5 s 24