103E.275 ENGINEER'S VARIANCE FROM DRAINAGE AUTHORITY ORDER.
(a) In planning a proposed drainage project, the engineer may vary from the starting point
and the line and plan described by the preliminary hearing order if necessary to drain the property
likely to be assessed in the proposed drainage project.
(b) The engineer may:
(1) survey and recommend the location of additional necessary ditches and tile;
(2) where better results will be accomplished and more desirable outlets secured, provide
for the extension of the outlet; and
(3) provide for different parts of the drainage to flow in different directions with more
than one outlet.
(c) The open ditches do not have to connect if they drain the area to be affected in the
petition. The variance must be reported with similar information in the detailed survey report.
History: 1990 c 391 art 5 s 43