Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

Office of the Revisor of Statutes

7011.2010 PERFORMANCE TEST METHODS.

Unless another method is approved by the commissioner, an owner or operator required to submit performance tests for an iron and steel plant must use the following test methods to demonstrate compliance:

A.

Method 1 for sample and velocity traverses;

B.

Method 2 for volumetric flow rate;

C.

Method 3 for gas analysis;

D.

Method 5 for concentration of filterable particulate matter and associated moisture content.

Statutory Authority:

MS s 115.03; 116.07

History:

18 SR 614; 41 SR 763

Published Electronically:

April 16, 2020

Official Publication of the State of Minnesota
Revisor of Statutes