Payment of the grant is contingent on complying with the following conditions:
The upgrade or replacement to the existing system must be designed by an evaluator/designer using data from an evaluator/designer.
The upgrade or replacement to the existing system must be inspected and approved by the inspector.
The upgrade or replacement to the existing system must meet the standards under chapter 7080 and must be completed in accordance with the approved wastewater treatment plan.
13 SR 1822; 15 SR 288; 16 SR 1800; 17 SR 3097
October 2, 2007
Official Publication of the State of Minnesota
Revisor of Statutes