Minnesota Administrative Rules
This is an historical version of this rule part. Also view the current version.
4715.1760 SUPPLY DEMAND.
The supply demand in gallons per minute in the building water distribution system shall be determined on the basis of the load in terms of supply fixture units and of the relationship between load and supply demand.
History:
L 2007 c 140 art 6 s 15; art 13 s 4
Published Electronically:
May 14, 2012
Official Publication of the State of Minnesota
Revisor of Statutes