UPC section 811 is amended to add subsection 811.9 as follows:
811.9 Waste and Vent. Thermal expansion and contraction compensation shall be provided for every 30 feet of developed horizontal or vertical length of run for thermoplastic piping as shown in Table 313.3.1.
MS s 326B.43
45 SR 1007
September 27, 2021
Official Publication of the State of Minnesota
Revisor of Statutes