Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

Office of the Revisor of Statutes

4620.3560 ASBESTOS PROJECT PLAN.

Subpart 1.

Applicability.

For each project other than a project in a single-family residence executed by the domiciled owner of the residence, the person performing abatement must prepare a project-specific asbestos project plan.

Subp. 2.

Plan availability.

The person performing abatement must have a complete and current asbestos project plan available for inspection at the project site at the start of the project.

Subp. 3.

Asbestos project plan content.

The asbestos project plan must contain:

A.

the name and address of the project site;

B.

a list of the asbestos work areas, including room numbers if known, of the project;

C.

the amount and type of asbestos-containing material to be removed, encapsulated, or enclosed in each asbestos work area;

D.

the date when the heating, ventilating, and air conditioning (HVAC) system for each asbestos work area will be shut down;

E.

the name of any person responsible for the shutdown in item D;

F.

the rated capacity of each negative air machine used to establish and maintain the negative air pressure of each containment;

G.

the calculation showing the number of containment air changes per hour and the number of negative air machines used to establish and maintain the required containment negative air pressure for each containment;

H.

documentation if a negative air system is to be exhausted indoors, why it is technically infeasible to exhaust the negative air system outdoors; and

I.

a floor plan or sketch which indicates:

(1)

the dimensions and volume of each containment;

(2)

the location of any negative air machines used in the asbestos work area;

(3)

the location of any decontamination unit to be used in conjunction with each asbestos work area; and

(4)

the type, size, and location of any containment attachments through which asbestos waste containers are removed from the containment.

Subp. 4.

Asbestos project plan changes.

If any information was estimated or a change occurs during the project, the new information must be added to the asbestos project plan as it becomes known.

Statutory Authority:

MS s 144.05; 326.70 to 326.81

History:

20 SR 2765

Published Electronically:

June 3, 2013

Official Publication of the State of Minnesota
Revisor of Statutes