2890.3300 SOIL BORING ADVANCEMENT.
§
Subpart 1.
General.
Costs for soil boring advancement are as described in this part.
§
Subp. 2.
Hollow-stem auger.
Hollow-stem auger drilling in sand, silt, or clay, with continuous sampling. Items A to D list the depth of the boring and the maximum cost per boring:
§
A.
0 - 25 feet, $1,128;
§
B.
26 - 50 feet, $1,128 plus $39 per foot beyond 25 feet;
§
C.
51 - 100 feet, $2,093 plus $68 per foot beyond 50 feet; and
§
D.
over 100 feet, $5,476 plus $85 per foot beyond 100 feet.
§
Subp. 3.
Mud or air rotary.
Mud or air rotary drilling in limestone or hard rock, with surface sampling only. Items A to D list the depth of the boring and the maximum cost per boring:
§
A.
0 - 25 feet, $2,054;
§
B.
26 - 50 feet, $2,054 plus $64 per foot beyond 25 feet;
§
C.
51 - 100 feet, $3,664 plus $75 per foot beyond 50 feet; and
§
D.
over 100 feet, $7,369 plus $97 per foot beyond 100 feet.
§
Subp. 4.
Air coring.
Air coring of limestone or hard rock with continuous sampling. Items A to D list the depth of the boring and the maximum cost per boring:
§
A.
0 - 25 feet, $2,254;
§
B.
26 - 50 feet, $2,254 plus $74 per foot beyond 25 feet;
§
C.
51 - 100 feet, $4,081 plus $76 per foot beyond 50 feet; and
§
D.
over 100 feet, $7,852 plus $108 per foot beyond 100 feet.
§
Subp. 5.
Rotosonic drilling.
Rotosonic drilling in sand, silt, or clay, with continuous sampling. Items A to D list the depth of the boring and the maximum cost per boring:
§
A.
0 - 25 feet, $2,336;
§
B.
26 - 50 feet, $2,336 plus $96 per foot beyond 25 feet;
§
C.
51 - 100 feet, $4,711 plus $103 per foot beyond 50 feet; and
§
D.
over 100 feet, $9,865 plus $134 per foot beyond 100 feet.
History:
28 SR 383; L 2010 c 241 s 4; MS s 115C.07 subd 3 paragraph (f)