The following utilities must file the information required by parts 7610.0100 to 7610.0700: Northern States Power Company, Minnesota Power, Otter Tail Power Company, Interstate Power Company, Minnkota Power Cooperative, Cooperative Power Association, United Power Association and Dairyland Power Cooperative, and the Southern Minnesota Municipal Power Agency. Data that is compiled within the same calendar year for either an extended forecast or a certificate of need application may be substituted interchangeably to satisfy those portions of both sets of rules that have identical data requirements. For these cases, references to the material substituted and a copy of the appropriate reference material must be submitted to meet the reporting requirements.
MS s 216C.10
L 1987 c 312 art 1 s 9; 16 SR 1400
January 19, 2005
Official Publication of the State of Minnesota
Revisor of Statutes