Status in the House - 91st Legislature (2019 - 2020)
Energy storage system pilot project utility cost recovery criteria established, investor-owned utilities required to include in integrated resource plans an assessment of energy storage systems, cost-benefit analysis of energy storage systems required, report required, and money appropriated.
| 01/17/2019 |
Introduction and first reading, referred to
Ways and Means
|
| 01/17/2019 |
Referred by Chair to
Energy and Climate Finance and Policy Division
|
| 01/24/2019 |
Author added
Albright
pg. 118
|
| 01/28/2019 |
Author added
Boe
pg. 145
|
| 02/07/2019 |
Author changed
Baker (Chief)
pg. 257
|
|
See Senate file in House
SF100
|
| House Actions | Senate Actions |
|---|---|
| 01/17/2019 | |
|
Introduction and first reading, referred to
Ways and Means
Referred by Chair to
Energy and Climate Finance and Policy Division
|
|
| 01/24/2019 | |
|
Author added
Albright
pg. 118
|
|
| 01/28/2019 | |
|
Author added
Boe
pg. 145
|
|
| 02/07/2019 | |
|
Author changed
Baker (Chief)
pg. 257
|
|
| Final Actions | |
|
See Senate file in House
SF100
|
|