Status in the House - 88th Legislature (2013 - 2014)
High-voltage transmission line routing-related issues study by the Legislative Energy Commission required.
| 02/11/2013 |
Introduction and first reading, referred to
Energy Policy
|
| 03/11/2013 |
Author added
Bly
pg. 862
|
| House Actions | Senate Actions |
|---|---|
| 02/11/2013 | |
|
Introduction and first reading, referred to
Energy Policy
|
|
| 03/11/2013 | |
|
Author added
Bly
pg. 862
|
|