Modifying the state mandate requiring certain public utilities to generate electric energy using biomass as a fuel, authorizing the use of agricultural crop waste to satisfy a certain percentage of the fuel requirements under certain conditions; restricting the installed capacity allowed to be provided by facilities using poultry litter as a primary fuel source, exempting the facilities from the farm grown closed loop biomass mandate and specifying certain capacity contracting and operational scheduling deadlines; requiring the public utilities commission to do preliminary reviews of contracts filed by public utilities for electric energy installed capacity using poultry litter for purchase price criteria compliance determination purposes, specifying a deadline for PUC approval, modification or disapproval of all contracts submitted; requiring public utility notice to the PUC by a certain date of decisions to increase the generating capacity of certain prior approved projects; providing for remaining megawatt of biomass power generating capacity final compliance with the biomass energy mandate; prohibiting the PUC from approving proposed projects with an adverse impact on the ability of a prior approved project from obtaining an adequate supply of the designated fuel source for the project; specifying a minimum agricultural biomass requirement of megawatt generating capacity(Ch. 443, 2000)