Status in the House for the 91st Legislature (2019 - 2020)
Utility cost recovery of energy storage system pilot project criteria established, investor-owned utilities required to include energy storage system assessment in integrated resource plans, energy storage system cost-benefit analysis required, report required, and money appropriated.
02/14/2019 |
Introduction and first reading, referred to Ways and Means
|
02/14/2019 |
Referred by Chair to Energy and Climate Finance and Policy Division
|
02/18/2019 |
Authors added Sandell and Dehn
pg.
411
|