Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

HF 4842

as introduced - 92nd Legislature (2021 - 2022) Posted on 04/28/2022 10:41am

KEY: stricken = removed, old language.
underscored = added, new language.

Bill Text Versions

Engrossments
Introduction Posted on 04/28/2022

Current Version - as introduced

Line numbers 1.1 1.2 1.3 1.4
1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 2.1 2.2 2.3 2.4 2.5
2.6 2.7 2.8 2.9 2.10 2.11 2.12
2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21

A bill for an act
relating to transportation; appropriating money for road improvements in the cities
of Eden Prairie and Edina.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:

Section 1. APPROPRIATION; GRANT TO EDEN PRAIRIE.

$53,300,000 in fiscal year 2023 is appropriated from the general fund to the commissioner
of transportation for a grant to the city of Eden Prairie for predesign, design, engineering,
easement acquisition, right-of-way acquisition, and construction of roads, retaining walls,
sidewalks, trails, lighting, stormwater utilities, water utilities, and wastewater utilities for
the following projects:

(1) reconstructing Dell Road from Crestwood Terrace to Flying Cloud Drive;

(2) reconstructing Riverview Road from Purgatory Creek to 900 feet east of Parker
Drive;

(3) reconstructing Duck Lake Trail from Dell Road to Eden Prairie Road;

(4) installing traffic signals and intersection improvements at the intersection of Prairie
Center Drive and Franlo Road;

(5) replacing Creek Knoll Bridge at Purgatory Creek;

(6) reconstructing Scenic Heights Road from Village Woods Drive to Red Rock Road;

(7) reconstructing Shady Oak Road from Flying Cloud Drive to Valley View Road;

(8) reconstructing West 78th Street from Prairie Center Drive to 1,400 feet west of
Washington Avenue;

(9) reconstructing Anderson Lakes Parkway from Flying Cloud Drive to Darnel Road;

(10) reconstructing Valley View Road from Edenvale Boulevard to Eden Prairie Road;
and

(11) reconstructing Roberts Drive from Topview Road to Baker Road.

This is a onetime appropriation and is available until June 30, 2029.

Sec. 2. APPROPRIATION; MARKED TRUNK HIGHWAY 5 INTERCHANGE.

$31,000,000 in fiscal year 2023 is appropriated from the general fund to the commissioner
of transportation to reconstruct the interchange at marked Trunk Highway 5 and Eden Prairie
Road. This appropriation may be used to predesign, design, engineer, construct, furnish,
equip, and acquire right-of-way for the project. The commissioner may use a portion of this
appropriation to make a grant to Hennepin County and the city of Eden Prairie. This is a
onetime appropriation and is available until June 30, 2028.

Sec. 3. APPROPRIATION; MARKED U.S. HIGHWAY 169 INTERCHANGE.

$22,000,000 in fiscal year 2023 is appropriated from the general fund to the commissioner
of transportation for reconstructing the interchange at marked U.S. Highway 169 and Valley
View Road, including the intersections of Valley View Road and Washington Avenue in
Eden Prairie and Valley View Road and McCauley Trail South in Edina. This appropriation
may be used to predesign, design, engineer, construct, furnish, equip, and acquire
right-of-way for the project. The commissioner may use a portion of this appropriation to
make a grant to the cities of Edina and Eden Prairie. This is a onetime appropriation and is
available until June 30, 2028.