Status in the House for the 86th Legislature (2009 - 2010)
Municipality design-build method of contracting pilot program created.
03/12/2009 |
Introduction and first reading, referred to Transportation and Transit Policy and Oversight Division
|
03/30/2009 |
Committee report, to pass as amended and re-refer to State and Local Government Operations Reform, Technology and Elections
pg.
1535a
|
03/31/2009 |
Referred by Chair to Local Government Division
|