326B.972 LICENSE REQUIREMENT.

(a) To operate a boiler, steam engine, or turbine an individual must have received a license for the grade covering that boiler, steam engine, or turbine. Except for licenses described in section 326B.956 and except for provisional licenses described in paragraphs (d) to (g):

(1) all initial licenses shall be for two years;

(2) the commissioner shall in a manner determined by the commissioner, without the need for any rulemaking under chapter 14, phase in the renewal of licenses from one year to two years; and

(3) by June 30, 2011, all licenses shall be two-year licenses.

(b) For purposes of sections 326B.952 to 326B.998, "operation" does not include monitoring of an automatic boiler, either through on premises inspection of the boiler or by remote electronic surveillance, provided that no operations are performed upon the boiler other than emergency shut down in alarm situations.

(c) No individual under the influence of illegal drugs or alcohol may operate a boiler, steam engine, or turbine or monitor an automatic boiler.

(d) The commissioner may issue a provisional license to allow an employee of a high pressure boiler plant to operate boilers greater than 500 horsepower at only that boiler plant if:

(1) the boiler plant has a designated chief engineer in accordance with Minnesota Rules, part 5225.0410;

(2) the boiler plant employee holds a valid license as a second-class engineer, Grade A or B;

(3) the chief engineer in charge of the boiler plant submits an application to the commissioner on a form prescribed by the commissioner to elicit information on whether the requirements of this paragraph have been met;

(4) the chief engineer in charge of the boiler plant and an authorized representative of the owner of the boiler plant both sign the application for the provisional license;

(5) the owner of the boiler plant has a documented training program with examination for boilers and equipment at the boiler plant to train and test the boiler plant employee; and

(6) if the application were to be granted, the total number of provisional licenses for employees of the boiler plant would not exceed the total number of properly licensed first-class engineers and chief engineers responsible for the safe operation of the boilers at the boiler plant.

(e) A public utility, cooperative electric association, generation and transmission cooperative electric association, municipal power agency, or municipal electric utility that employs licensed boiler operators who are subject to an existing labor contract may use a provisional licensee as an operator only if using the provisional licensee does not violate the labor contract.

(f) Each provisional license expires 36 months after the date of issuance unless revoked less than 36 months after the date of issuance. A provisional license may not be renewed.

(g) The commissioner may issue no more than two provisional licenses to any individual within a four-year period.