Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

Office of the Revisor of Statutes

116.801 INCINERATION OF INFECTIOUS WASTE; PERMIT REQUIRED.
(a) Except as provided in paragraph (b), a person may not construct, or expand the capacity
of, a facility for the incineration of infectious waste, as defined in section 116.76, without having
obtained an air emission permit from the agency.
(b) This section does not affect permit requirements under the rules of the agency for an
incinerator that is upgraded to meet pollution control standards or an incinerator with a capacity
of 350 pounds or less per hour that is planned to manage waste generated primarily by the owner
or operator of the incinerator.
History: 1991 c 231 s 1

Official Publication of the State of Minnesota
Revisor of Statutes