115A.193 REPORT ON FACILITY DEVELOPMENT.
The commissioner shall prepare a report concerning the development of a stabilization and
containment facility. The report must include:
(a) a conceptual plan that describes and evaluates the proposed design and operation of
the facility, including an evaluation of technical feasibility, a description and evaluation of the
types and quantities of hazardous waste and nonhazardous residual waste from hazardous waste
processing that the facility would be designed to accept, and a description and evaluation of
technologies needed or desired at the facility for processing, stabilization, and containment,
including above grade containment;
(b) procedures and standards for the operation of the facility that require the use of reduction,
recycling, and recovery of any hazardous waste before the waste is accepted for stabilization when
the alternative or additional management method is feasible and prudent and would materially
reduce adverse impact on human health and the environment;
(c) evaluation of the design and use of the facility for processing, stabilization, or
containment of industrial waste, including technical and regulatory issues and alternative
management methods;
(d) evaluation of feasible and prudent technologies that may substantially reduce the
possibility of migration of any hazardous constituents of wastes that the facility would be
designed to accept;
(e) a general analysis of the necessary and desirable physical, locational, and other
characteristics of a site for the facility;
(f) an evaluation of the prospects of and conditions required for the regulatory delisting of
residual waste from hazardous waste processing;
(g) an evaluation of the feasibility of an interstate, regional approach to the management of
hazardous waste; and
(h) an economic feasibility analysis of the development and operation of the facility,
including the anticipated use of the facility by Minnesota generators from within and outside
the state, and sources of private and public financing that may be available or necessary for
development or operation.
The commissioner shall submit a draft of the report to the agency and the Legislative
Commission on Waste Management by July 1, 1988, and before executing contracts under section
115A.191.
History: 1986 c 425 s 26; 1989 c 335 art 1 s 269; 1Sp2005 c 1 art 2 s 161

Official Publication of the State of Minnesota
Revisor of Statutes