Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

Office of the Revisor of Statutes

7835.4015 TIME-OF-DAY PURCHASE RATES.

Subpart 1.

Method of billing.

The qualifying facility must be billed for all energy and capacity it consumes during each billing period according to the utility's applicable retail rate schedule. Any utility rate-regulated by the commission may propose time-of-day retail rate tariffs which require qualifying facilities that choose to sell power on a time-of-day basis to also purchase power on a time-of-day basis.

Subp. 2.

Compensation to qualifying facility.

The utility must purchase all energy and capacity which is made available to it by the qualifying facility. Compensation to the qualifying facility must be the sum of items A and B.

A.

The energy component must be the appropriate on-peak and off-peak system incremental costs shown on schedule A; or if the generating utility has not filed schedule A, the energy component must be the energy rate of the retail rate schedule applicable to the qualifying facility, filed in lieu of schedules A and B; or if the nongenerating utility has not filed schedule A, the energy component must be the energy rate shown on schedule H.

B.

If the qualifying facility provides firm power to the utility, the capacity component must be the utility's net annual avoided capacity cost per kilowatt-hour averaged over the on-peak hours as shown on schedule B; or if the generating utility has not filed schedule B, the capacity component must be the demand charge per kilowatt, if any, of the retail rate schedule applicable to the qualifying facility, filed in lieu of schedules A and B, divided by the number of on-peak hours in the billing period; or if the nongenerating utility has not filed schedule B, the capacity component must be the capacity cost per kilowatt shown on schedule H, divided by the number of on-peak hours in the billing period. The capacity component applies only to deliveries during on-peak hours. If the qualifying facility does not provide firm power to the utility, no capacity component may be included in the compensation paid to the qualifying facility.

Statutory Authority:

MS s 216A.05; 216B.08; 216B.164

History:

40 SR 348

Published Electronically:

October 12, 2015

Official Publication of the State of Minnesota
Revisor of Statutes