Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

SF 3118

1st Engrossment - 80th Legislature (1997 - 1998) Posted on 12/15/2009 12:00am

KEY: stricken = removed, old language.
underscored = added, new language.

Current Version - 1st Engrossment

  1.1                          A bill for an act 
  1.2             relating to natural resources; modifying provisions 
  1.3             for a timber permit extension; amending Minnesota 
  1.4             Statutes 1996, section 90.193. 
  1.5   BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA: 
  1.6      Section 1.  Minnesota Statutes 1996, section 90.193, is 
  1.7   amended to read: 
  1.8      90.193 [EXTENSION OF TIMBER PERMITS.] 
  1.9      (a) The commissioner may, in the case of an exceptional 
  1.10  circumstance beyond the control of the timber permit holder 
  1.11  which makes it unreasonable, impractical, and not feasible to 
  1.12  complete cutting and removal under the permit within the time 
  1.13  allowed, grant an extension of one year.  A request for the 
  1.14  extension must be received by the commissioner before the permit 
  1.15  expires.  The request must state the reason the extension is 
  1.16  necessary and be signed by the permit holder.  The value of the 
  1.17  timber remaining to be cut will be recalculated using current 
  1.18  stumpage rates.  Any timber cut during the period of extension 
  1.19  or remaining uncut at the expiration of the extension shall be 
  1.20  billed for at the stumpage rates determined at the time of 
  1.21  extension provided that in no event shall stumpage rates be less 
  1.22  than those in effect at the time of the original sale.  An 
  1.23  interest rate of eight percent will be charged for the period of 
  1.24  extension.  
  1.25     (b) A timber permit holder may request an extension of the 
  2.1   permit if the commissioner has directed the permit holder during 
  2.2   the last year of the permit period not to operate equipment or 
  2.3   harvest timber in the permit area for any part of an operating 
  2.4   season allowed by the permit.  The commissioner must grant an 
  2.5   extension of the permit for a period not to exceed one year and 
  2.6   may not charge any interest for the period of the extension.