Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

HF 1151

as introduced - 90th Legislature (2017 - 2018) Posted on 02/13/2017 12:17pm

KEY: stricken = removed, old language.
underscored = added, new language.
Line numbers 1.1 1.2 1.3 1.4 1.5
1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27
2.28

A bill for an act
relating to energy; eliminating the requirement to obtain a certificate of need prior
to constructing a pipeline transporting oil or natural gas in the state; amending
Minnesota Statutes 2016, section 216B.243, subdivision 8.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:

Section 1.

Minnesota Statutes 2016, section 216B.243, subdivision 8, is amended to read:


Subd. 8.

Exemptions.

(a) This section does not apply to:

(1) cogeneration or small power production facilities as defined in the Federal Power
Act, United States Code, title 16, section 796, paragraph (17), subparagraph (A), and
paragraph (18), subparagraph (A), and having a combined capacity at a single site of less
than 80,000 kilowatts; plants or facilities for the production of ethanol or fuel alcohol; or
any case where the commission has determined after being advised by the attorney general
that its application has been preempted by federal law;

(2) a high-voltage transmission line proposed primarily to distribute electricity to serve
the demand of a single customer at a single location, unless the applicant opts to request
that the commission determine need under this section or section 216B.2425;

(3) the upgrade to a higher voltage of an existing transmission line that serves the demand
of a single customer that primarily uses existing rights-of-way, unless the applicant opts to
request that the commission determine need under this section or section 216B.2425;

(4) a high-voltage transmission line of one mile or less required to connect a new or
upgraded substation to an existing, new, or upgraded high-voltage transmission line;

(5) conversion of the fuel source of an existing electric generating plant to using natural
gas;

(6) the modification of an existing electric generating plant to increase efficiency, as
long as the capacity of the plant is not increased more than ten percent or more than 100
megawatts, whichever is greater;

(7) a wind energy conversion system or solar electric generation facility if the system
or facility is owned and operated by an independent power producer and the electric output
of the system or facility is not sold to an entity that provides retail service in Minnesota or
wholesale electric service to another entity in Minnesota other than an entity that is a federally
recognized regional transmission organization or independent system operator; deleted text begin or
deleted text end

(8) a large wind energy conversion system, as defined in section 216F.01, subdivision
2
, or a solar energy generating large energy facility, as defined in section 216B.2421,
subdivision 2
, engaging in a repowering project that:

(i) will not result in the facility exceeding the nameplate capacity under its most recent
interconnection agreement; or

(ii) will result in the facility exceeding the nameplate capacity under its most recent
interconnection agreement, provided that the Midcontinent Independent System Operator
has provided a signed generator interconnection agreement that reflects the expected net
power increasedeleted text begin .deleted text end new text begin ;
new text end

new text begin (9) a pipeline transporting crude oil, petroleum fuels or oil, or their derivatives; or
new text end

new text begin (10) a pipeline transporting natural gas.
new text end

(b) For the purpose of this subdivision, "repowering project" means:

(1) modifying a large wind energy conversion system or a solar energy generating large
energy facility to increase its efficiency without increasing its nameplate capacity;

(2) replacing turbines in a large wind energy conversion system without increasing the
nameplate capacity of the system; or

(3) increasing the nameplate capacity of a large wind energy conversion system.

new text begin EFFECTIVE DATE. new text end

new text begin This section is effective the day following final enactment.
new text end