Status in the House for the 88th Legislature (2013 - 2014)
High-voltage transmission line routing-related issues study by the Legislative Energy Commission required.
House Actions | |
---|---|
02/11/2013 | |
Introduction and first reading, referred to Energy Policy
|
|
03/11/2013 | |
Author added Bly
pg.
862
|