Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

Office of the Revisor of Statutes

103E.221 IMPROVEMENT OF OUTLETS.
    Subdivision 1. Conditions for improvement of outlets. If a public or private proposed
drainage project or existing drainage system has waters draining into an existing drainage system,
watercourse, or body of water, and the construction or proposed construction of the drainage
project causes an overflow of the existing drainage system, watercourse, or body of water on
adjoining property, an affected county or the owners of the overflowed property may start outlet
improvement proceedings under this section.
    Subd. 2. Petition. (a) A petition must be signed by the board of an affected county, by at
least 26 percent of the owners of adjoining overflowed property, or by the owners of at least 26
percent of the area of the overflowed property. The petition must:
(1) describe the property that has been or is likely to be overflowed including the names and
addresses of the property owners from records in the county assessor's office;
(2) state in general terms by number or otherwise the drainage systems that have caused
or are likely to cause the overflow;
(3) describe the location of the overflowed drainage system, watercourse, or body of water
and the outlet;
(4) show the necessity of the improvement by enlarging the system or controlling the waters
by off-take ditches, additional outlets, or otherwise;
(5) show that the outlet improvement will protect the adjoining property from overflow;
(6) state that the improvement will be of public benefit and utility and improve the public
health; and
(7) state that the petitioners will pay all costs incurred if the proceedings are dismissed or a
contract for construction of the outlet improvement is not awarded.
(b) The petitioners, except for a petition made by the board, shall give the required bond.
    Subd. 3. Filing of petition. The petition shall be filed with the county auditor. If the board
makes the petition, it must be addressed to the drainage authority and filed with the auditor. If part
of the improvement or the overflowed property is located in more than one county, the petition
must be filed with the auditor of the county with the greatest affected area.
    Subd. 4. Jurisdiction of drainage authority. After the petition is filed, the board or
joint county drainage authority where the petition is filed has jurisdiction of the petition, the
improvement, the affected property, and all proceedings for the establishment and construction of
the outlet improvement and the assessment of property benefited by the outlet improvement, as
provided for establishment and construction of a drainage project under this chapter.
    Subd. 5. Preliminary survey report requirements. In the preliminary survey report, the
engineer shall show the existing or proposed drainage projects or systems that cause the overflow,
the property drained or to be drained by the drainage project, and the names of affected property
owners.
    Subd. 6. Benefited property to be determined by viewers. If, after the preliminary survey
report hearing, a detailed survey is ordered and viewers are appointed, the viewers shall determine
and report the benefits to all property from the outlet improvement including property drained or
to be drained by the existing drainage system and proposed drainage project.
History: 1990 c 391 art 5 s 30

Official Publication of the State of Minnesota
Revisor of Statutes