Status in the House for the 88th Legislature (2013 - 2014)
Nuclear energy recoverable costs specified, equipment installation required, and certificate of need for waste issuance storage for facilities operating for more than 60 years prohibited.
05/02/2013 |
Introduction and first reading, referred to Energy Policy
|
05/13/2013 |
Author added Slocum
pg.
4474
|