Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

HF 689

1st Engrossment - 86th Legislature (2009 - 2010) Posted on 02/09/2010 01:40am

KEY: stricken = removed, old language.
underscored = added, new language.

Current Version - 1st Engrossment

Line numbers 1.1 1.2 1.3 1.4 1.5
1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 2.30 2.31 2.32 2.33 2.34 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22
3.23

A bill for an act
relating to energy; mandating consideration of strategic tree planting for energy
conservation improvement project for buildings; amending Minnesota Statutes
2008, section 216B.241, subdivision 9.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:

Section 1.

Minnesota Statutes 2008, section 216B.241, subdivision 9, is amended to
read:


Subd. 9.

Building performance standards; Sustainable Building 2030.

(a) The
purpose of this subdivision is to establish cost-effective energy-efficiency performance
standards for new and substantially reconstructed commercial, industrial, and institutional
buildings that can significantly reduce carbon dioxide emissions by lowering energy use in
new and substantially reconstructed buildings. For the purposes of this subdivision, the
establishment of these standards may be referred to as Sustainable Building 2030.

(b) The commissioner shall contract with the Center for Sustainable Building
Research at the University of Minnesota to coordinate development and implementation
of energy-efficiency performance standards, strategic planning, research, data analysis,
technology transfer, training, and other activities related to the purpose of Sustainable
Building 2030. The commissioner and the Center for Sustainable Building Research
shall, in consultation with utilities, builders, developers, building operators, and experts
in building design and technology, develop a Sustainable Building 2030 implementation
plan that must address, at a minimum, the following issues:

(1) training architects to incorporate the performance standards in building design;

(2) incorporating the performance standards in utility conservation improvement
programs; and

(3) developing procedures for ongoing monitoring of energy use in buildings that
have adopted the performance standards.

The plan must be submitted to the chairs and ranking minority members of the senate and
house of representatives committees with primary jurisdiction over energy policy by
July 1, 2009.

(c) Sustainable Building 2030 energy-efficiency performance standards must be firm,
quantitative measures of total building energy use and associated carbon dioxide emissions
per square foot for different building types and uses, that allow for accurate determinations
of a building's conformance with a performance standard. The energy-efficiency
performance standards must be updated every three or five years to incorporate all
cost-effective measures. The performance standards must reflect the reductions in carbon
dioxide emissions per square foot resulting from actions taken by utilities to comply
with the renewable energy standards in section 216B.1691. The performance standards
should be designed to achieve reductions equivalent to the following reduction schedule,
measured against energy consumption by an average building in each applicable building
sector in 2003: (1) 60 percent in 2010; (2) 70 percent in 2015; (3) 80 percent in 2020;
and (4) 90 percent in 2025. A performance standard must not be established or increased
absent a conclusive engineering analysis that it is cost-effective based upon established
practices used in evaluating utility conservation improvement programs.

(d) The annual amount of the contract with the Center for Sustainable Building
Research is up to $500,000. The Center for Sustainable Building Research shall expend
no more than $150,000 of this amount each year on administration, coordination, and
oversight activities related to Sustainable Building 2030. The balance of contract funds
must be spent for subcontracts with not-for-profit energy organizations, architecture and
engineering firms, and other qualified entities to undertake technical projects and activities
in support of Sustainable Building 2030. The primary work to be accomplished each
year by qualified technical experts under subcontracts is the development and thorough
justification of recommendations for specific energy-efficiency performance standards.
Additional work may include:

(1) research, development, and demonstration of new energy-efficiency technologies
and techniques suitable for commercial, industrial, and institutional buildings;

(2) analysis and evaluation of practices in building design, construction,
commissioning and operations, and analysis and evaluation of energy use in the
commercial, industrial, and institutional sectors;

(3) analysis and evaluation of the effectiveness and cost-effectiveness of Sustainable
Building 2030 performance standards, conservation improvement programs, and building
energy codes;

(4) development and delivery of training programs for architects, engineers,
commissioning agents, technicians, contractors, equipment suppliers, developers, and
others in the building industries; and

(5) analyze and evaluate the effect of building operations on energy use.

(e) The commissioner shall require utilities to develop and implement conservation
improvement programs that are expressly designed to achieve energy efficiency goals
consistent with the Sustainable Building 2030 performance standards. These programs
must include offerings of design assistance and modeling, financial incentives, and the
verification of the proper installation of energy-efficient design components in new and
substantially reconstructed buildings. new text begin A utility's design assistance program must consider
the strategic planting of trees and shrubs around buildings as an energy conservation
strategy for the designed project.
new text end A utility making an expenditure under its conservation
improvement program that results in a building meeting the Sustainable Building 2030
performance standards may claim the energy savings toward its energy-savings goal
established in subdivision 1c.

(f) The commissioner shall report to the legislature every three years, beginning
January 15, 2010, on the cost-effectiveness and progress of implementing the Sustainable
Building 2030 performance standards and shall make recommendations on the need to
continue the program as described in this section.

new text begin EFFECTIVE DATE. new text end

new text begin This section is effective the day following final enactment.
new text end