Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

HF 901

as introduced - 87th Legislature (2011 - 2012) Posted on 03/07/2011 09:29am

KEY: stricken = removed, old language.
underscored = added, new language.

Bill Text Versions

Engrossments
Introduction Posted on 03/07/2011

Current Version - as introduced

Line numbers 1.1 1.2 1.3 1.4 1.5
1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 2.30 2.31 2.32 2.33 2.34 2.35 2.36 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 3.28 3.29 3.30 3.31 3.32 3.33 3.34 3.35 3.36 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 4.26 4.27 4.28 4.29 4.30 4.31 4.32 4.33 4.34 4.35 4.36 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10

A bill for an act
relating to natural resources; modifying certain wetland replacement
requirements; amending Minnesota Statutes 2010, section 103G.222, subdivision
1.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:

Section 1.

Minnesota Statutes 2010, section 103G.222, subdivision 1, is amended to
read:


Subdivision 1.

Requirements.

(a) Wetlands must not be drained or filled, wholly
or partially, unless replaced by restoring or creating wetland areas of at least equal
public value under a replacement plan approved as provided in section 103G.2242, a
replacement plan under a local governmental unit's comprehensive wetland protection
and management plan approved by the board under section 103G.2243, or, if a permit to
mine is required under section 93.481, under a mining reclamation plan approved by
the commissioner under the permit to mine. new text begin For project-specific wetland replacement
conducted under a permit to mine within the Great Lakes and Rainy River watershed
basins, those basins shall be considered a single watershed for purposes of determining
wetland replacement ratios.
new text end Mining reclamation plans shall apply the same principles
and standards for replacing wetlands by restoration or creation of wetland areas that
are applicable to mitigation plans approved as provided in section 103G.2242. Public
value must be determined in accordance with section 103B.3355 or a comprehensive
wetland protection and management plan established under section 103G.2243. Sections
103G.221 to 103G.2372 also apply to excavation in permanently and semipermanently
flooded areas of types 3, 4, and 5 wetlands.

(b) Replacement must be guided by the following principles in descending order
of priority:

(1) avoiding the direct or indirect impact of the activity that may destroy or diminish
the wetland;

(2) minimizing the impact by limiting the degree or magnitude of the wetland
activity and its implementation;

(3) rectifying the impact by repairing, rehabilitating, or restoring the affected
wetland environment;

(4) reducing or eliminating the impact over time by preservation and maintenance
operations during the life of the activity;

(5) compensating for the impact by restoring a wetland; and

(6) compensating for the impact by replacing or providing substitute wetland
resources or environments.

For a project involving the draining or filling of wetlands in an amount not exceeding
10,000 square feet more than the applicable amount in section 103G.2241, subdivision 9,
paragraph (a), the local government unit may make an on-site sequencing determination
without a written alternatives analysis from the applicant.

(c) If a wetland is located in a cultivated field, then replacement must be
accomplished through restoration only without regard to the priority order in paragraph
(b), provided that a deed restriction is placed on the altered wetland prohibiting
nonagricultural use for at least ten years.

(d) If a wetland is drained under section 103G.2241, subdivision 2, paragraphs
(b) and (e), the local government unit may require a deed restriction that prohibits
nonagricultural use for at least ten years unless the drained wetland is replaced as provided
under this section. The local government unit may require the deed restriction if it
determines the wetland area drained is at risk of conversion to a nonagricultural use within
ten years based on the zoning classification, proximity to a municipality or full service
road, or other criteria as determined by the local government unit.

(e) Restoration and replacement of wetlands must be accomplished in accordance
with the ecology of the landscape area affected and ponds that are created primarily to
fulfill storm water management, and water quality treatment requirements may not be
used to satisfy replacement requirements under this chapter unless the design includes
pretreatment of runoff and the pond is functioning as a wetland.

(f) Except as provided in paragraph (g), for a wetland or public waters wetland
located on nonagricultural land, replacement must be in the ratio of two acres of replaced
wetland for each acre of drained or filled wetland.

(g) For a wetland or public waters wetland located on agricultural land or in a greater
than 80 percent area, replacement must be in the ratio of one acre of replaced wetland
for each acre of drained or filled wetland.

(h) Wetlands that are restored or created as a result of an approved replacement plan
are subject to the provisions of this section for any subsequent drainage or filling.

(i) Except in a greater than 80 percent area, only wetlands that have been restored
from previously drained or filled wetlands, wetlands created by excavation in nonwetlands,
wetlands created by dikes or dams along public or private drainage ditches, or wetlands
created by dikes or dams associated with the restoration of previously drained or filled
wetlands may be used in a statewide banking program established in rules adopted under
section 103G.2242, subdivision 1. Modification or conversion of nondegraded naturally
occurring wetlands from one type to another are not eligible for enrollment in a statewide
wetlands bank.

(j) The Technical Evaluation Panel established under section 103G.2242, subdivision
2
, shall ensure that sufficient time has occurred for the wetland to develop wetland
characteristics of soils, vegetation, and hydrology before recommending that the wetland
be deposited in the statewide wetland bank. If the Technical Evaluation Panel has reason
to believe that the wetland characteristics may change substantially, the panel shall
postpone its recommendation until the wetland has stabilized.

(k) This section and sections 103G.223 to 103G.2242, 103G.2364, and 103G.2365
apply to the state and its departments and agencies.

(l) For projects involving draining or filling of wetlands associated with a new public
transportation project, and for projects expanded solely for additional traffic capacity,
public transportation authorities may purchase credits from the board at the cost to the
board to establish credits. Proceeds from the sale of credits provided under this paragraph
are appropriated to the board for the purposes of this paragraph. For the purposes of this
paragraph, "transportation project" does not include an airport project.

(m) A replacement plan for wetlands is not required for individual projects that
result in the filling or draining of wetlands for the repair, rehabilitation, reconstruction,
or replacement of a currently serviceable existing state, city, county, or town public road
necessary, as determined by the public transportation authority, to meet state or federal
design or safety standards or requirements, excluding new roads or roads expanded solely
for additional traffic capacity lanes. This paragraph only applies to authorities for public
transportation projects that:

(1) minimize the amount of wetland filling or draining associated with the project
and consider mitigating important site-specific wetland functions on site;

(2) except as provided in clause (3), submit project-specific reports to the board, the
Technical Evaluation Panel, the commissioner of natural resources, and members of the
public requesting a copy at least 30 days prior to construction that indicate the location,
amount, and type of wetlands to be filled or drained by the project or, alternatively,
convene an annual meeting of the parties required to receive notice to review projects to
be commenced during the upcoming year; and

(3) for minor and emergency maintenance work impacting less than 10,000 square
feet, submit project-specific reports, within 30 days of commencing the activity, to the
board that indicate the location, amount, and type of wetlands that have been filled
or drained.

Those required to receive notice of public transportation projects may appeal
minimization, delineation, and on-site mitigation decisions made by the public
transportation authority to the board according to the provisions of section 103G.2242,
subdivision 9
. The Technical Evaluation Panel shall review minimization and delineation
decisions made by the public transportation authority and provide recommendations
regarding on-site mitigation if requested to do so by the local government unit, a
contiguous landowner, or a member of the Technical Evaluation Panel.

Except for state public transportation projects, for which the state Department of
Transportation is responsible, the board must replace the wetlands, and wetland areas of
public waters if authorized by the commissioner or a delegated authority, drained or filled
by public transportation projects on existing roads.

Public transportation authorities at their discretion may deviate from federal and
state design standards on existing road projects when practical and reasonable to avoid
wetland filling or draining, provided that public safety is not unreasonably compromised.
The local road authority and its officers and employees are exempt from liability for
any tort claim for injury to persons or property arising from travel on the highway and
related to the deviation from the design standards for construction or reconstruction under
this paragraph. This paragraph does not preclude an action for damages arising from
negligence in construction or maintenance on a highway.

(n) If a landowner seeks approval of a replacement plan after the proposed project
has already affected the wetland, the local government unit may require the landowner to
replace the affected wetland at a ratio not to exceed twice the replacement ratio otherwise
required.

(o) A local government unit may request the board to reclassify a county or
watershed on the basis of its percentage of presettlement wetlands remaining. After
receipt of satisfactory documentation from the local government, the board shall change
the classification of a county or watershed. If requested by the local government unit,
the board must assist in developing the documentation. Within 30 days of its action to
approve a change of wetland classifications, the board shall publish a notice of the change
in the Environmental Quality Board Monitor.

(p) One hundred citizens who reside within the jurisdiction of the local government
unit may request the local government unit to reclassify a county or watershed on the basis
of its percentage of presettlement wetlands remaining. In support of their petition, the
citizens shall provide satisfactory documentation to the local government unit. The local
government unit shall consider the petition and forward the request to the board under
paragraph (o) or provide a reason why the petition is denied.