Status in the House for the 91st Legislature (2019 - 2020)
Pipeline construction authorized.
02/27/2019 |
Introduction and first reading, referred to Energy and Climate Finance and Policy Division
|
02/28/2019 |
Author added Poston
pg.
698
|