Status in the House for the 91st Legislature (2019 - 2020)
Energy storage system pilot project utility cost recovery criteria established, investor-owned utilities required to include in integrated resource plans an assessment of energy storage systems, cost-benefit analysis of energy storage systems required, report required, and money appropriated.
01/17/2019 |
Introduction and first reading, referred to Ways and Means
|
01/17/2019 |
Referred by Chair to Energy and Climate Finance and Policy Division
|
01/24/2019 |
Author added Albright
pg.
118
|
01/28/2019 |
Author added Boe
pg.
145
|
02/07/2019 |
Author changed Baker (Chief)
pg.
257
|
See Senate file in House SF100
|